WP | Work Package Title | Leader |
---|---|---|
WP1 | Management | Lancaster University (UK) |
WP2 | Scenario definitions, modelling and specifications | Goethe Universität (DE) |
WP3 | D-band TWT and G-band TWT | Lancaster University (UK) |
WP4 | D – band Point to multipoint wireless system | OMMIC (FR) |
WP5 | G-band Point to Point wireless system | HFSE (DE) |
WP6 | System testing and proof of concept in realistic scenarios | Fibernova (ES) |
WP7 | Dissemination and Exploitation | Universitat Politècnica de València (ES) |
WP1: MANAGEMENT
Leader: Lancaster University
The WP1 include all the actions for a successful project management of the scientific, financial and team related aspects of the project. This work package is also aimed at fostering a close and fruitful technical collaboration among the partners and the communications with the European Commission.
WP2: SCENARIO DEFINITIONS, MODELLING AND SPECIFICATIONS
Leader: Goethe University
WP2 is devoted to the identification of future scenarios that will be open by ULTRAWAVE technologies as well as the definition of the specifications both at component and system level.
WP3: D-BAND TWT AND G-BAND TWT
Leader: Lancaster University
The aim of WP3 is the design, fabrication and test of two novel high power, wideband Traveling Wave Tubes (TWT) at D-band and G-band. These TWTs will be the enabling devices for the exploitation of the millimeter wave spectrum. The available high transmission power will permit to overcome the high link losses and provide useful transmission range.
WP4: D – BAND POINT TO MULTIPOINT WIRELESS SYSTEM
Leader: OMMIC
The component for the D-band PmP system and the final integration will be the target of WP4. It includes the development of the first European full D-band chipset, the filter and the antennas for the final integration of the D-band Transmission Hub and Terminal.
WP5: G-BAND POINT TO POINT WIRELESS SYSTEM
Leader: HFSE
WP5 will develop the component for the G-band PmP system and the integration for outdoor test. It includes all the tasks required to merge for the first time a photonic transmitter, a G-band chipset and a G-band TWT in a G-band PtP system.
WP6: SYSTEM TESTING AND PROOF OF CONCEPT IN REALISTIC SCENARIOS
Leader: Fibernova
This work package is aimed at validating ULTRAWAVE concept. It includes the preparation of the test scenario for the D-band PmP and G-band PtP links and their validation, for the first worldwide, in a real operating environment.
WP7: DISSEMINATION AND EXPLOITATION
Leader: Universitat Politècnica de València
The objective of WP7 is to maximise the impact of ULTRAWAVE technology through activities to exploit project results and dissemination of project results. Different types of dissemination activities, each addressed to a specific target group: scientific community, industrial community, end users such as telecom operators, and the wide-public, will be carried out.